The construction of US Bank Stadium required the use of a lightweight fill material in multiple areas throughout the site. STYRO-FLEX EPS Geofoam was used exclusively to fulfill the many requirements of this complex project.
Finished project
Geofoam used to raise the grade at east elevation
Geofoam blocks being installed
Geofoam being installed to reduce load on underground parking structure
Geofoam being installed to reduce load on underground parking structure